Bridge crossing over the Ob River along Ippodromskaya Street in Novosibirsk

Financial and technical consulting on behalf of the financing bank, construction supervision over the capital project for building a bridge crossing the Ob River along Ippodromskaya Street in Novosibirsk

Background

SKK LLC entered into a concession agreement, according to which SKK was granted the right to design, build, finance, operate, and maintain the bridge crossing over the Ob River in line with Ippodromskaya street in Novosibirsk

For implementation of the project and independent technical control during the construction of the highway, SKK involved construction control

Tasks

  • Quality control of used construction materials, products, structures, and equipment
  • Control of compliance with technology and quality of construction and installation, including control of compliance with approved working documentation
  • Control of compliance by the general contractor with the construction schedule
  • Verification of implementation by the contractor of control measures to comply with the rules of warehousing and storage of used products
  • Verification of compliance of the completed construction facility with the requirements of the design and working documentation, the results of engineering surveys, the requirements of the urban development plan of the land plot, and the requirements of technical regulations

Results

Term of project implementation: 2018 – 2023

Work is carried out in accordance with approved construction schedules

Bridge crossing over the Ob River along Ippodromskaya Street in Novosibirsk

Bridge crossing over the Ob River along Ippodromskaya Street in Novosibirsk

Financial and technical consulting on behalf of the financing bank, construction supervision over the capital project for building a bridge crossing the Ob River along Ippodromskaya Street in Novosibirsk